INVESTMENT IN NEW TECHNOLOGIES

Talking about investment in the equipment we must say that the entire apparatus is technologically advanced. Sante started with a small crane, some scaffolds, and a van. In 1994, the company bought the first real crane to replace the small crane from the beginning.

Year after year, Danelon brothers continued investing in new equipment including an 18 meter crane and, in 1997, a 30 meter crane, an essential instrument for big construction. Also, they bought two concrete mixers, excavating, scaffolds with parapets and other supporting tools.

The scaffold was also replaced in 1998, even though it was almost new. The replacement was caused by the need to implement the new scaffold generation, with safe assembling provided.

This means that when someone goes up to the upper floor, the parapet is already prepared and coated with zinc by the Mefran. The parapet is build up by the low which means that one time someone wants to dismantle it, he has to be below the parapet.


<back - next >

 
     
 
© Gruppo Danelon 2007  
Buildings Real estate Restructuring Asbestos Reclamation